Ecologia has successfully completed the installation and commissioning of the next phase of remediation works at a chemical facility in Castiglione, Italy. The works involved the installation of a second multi phase extraction equipment that was designed and built in the UK by Ecologia.

The equipment has been produced and supplied to deliver the requirements of a project to remove contamination in the vadose zone in a second area of the site using multi-phase extraction to remove contaminated perched water and hydrocarbon laden soil vapour. The system utilised Ecologia’s full range of automation and telemetry with real time on-line monitoring of off gases and vapours running through the system to provide an up to date picture for our client and our staff working on the project in the UK.

The equipment has been well received by the client who is delighted with the quality of the service and remediation equipment provided by Ecologia.