Ecologia has been appointed to undertake the injection of a novel product to induce the in-situ chemical reduction of contaminant metals at a site in Scotland. Ecologia will  install over 50 injection wells to 10m below ground level with our in-house drilling rig and bespoke injection equipment. Ecologia will undertake four phases of injections planned for the next four years. The wells are being drilled with our sonic drill rig which provides high quality cores to guide the accurate installation of the response zone for each injection well. This will ensure that the product is  injected at the correct depth in each location. The injection equipment is being manufactured at our workshop in Kent and will provide batch mixing and pressurised, flow controlled, injection capability to 10 wells concurrently. The works are being staffed by Ecologia personnel and are under a fixed priced contract.