Skip to content
Switch country:
Italy
GB
Menu
Home
Chi Siamo
QHSE
Meet Our Team
Innovazione
Clienti e Industrie
Close
Cosa Facciamo
Consulenza Qualificata e Caratterizzazioni di Sito
Monitoraggi Ambientali
Interventi di Bonifica del Suolo e Acque di Falda
Progettazione e Assistenza
Intermediazione Rifiuti
Messa in Sicurezza D’Emergenza
Close
Tecnologie
Air Sparging
Bioremediation
Chemical Oxidation
De-watering Management & Treatment
Dual/multiphase Extraction
In-situ Radio Frequency Heating (ISRFH) Technology
Non-Aqueous Phase Liquids (NAPL) Recovery (LNAPL/DNAPL)
Ozone Sparging
Pump and Treat
Soil Vapour Extraction (SVE) / Bioventing
Steam Injection for Enhanced NAPL Recovery
Surfactant Flushing
Close
Progetti
Lavora Con Noi
News
Contatti
CASI STUDIO
Bulk Excavation and Validation, Chemical Facility, UK
18.01.18
READ
Brownfield Development of Former Gas Works, Ashford, UK
18.01.18
READ
Remediation Design and Implementation for Major Infrastructure Project, London
22.07.16
READ
Various Major Infrastructure Projects, London – Numerous
22.07.16
READ
Acorn Street SI – Confidential Local Authority
22.07.16
READ
Confidential Chemical Manufacturer – UK
22.07.16
READ
Ozone Sparging & Ex-Situ Bioremediation – Hounslow
22.07.16
READ
Supply and Operation of Multiphase System – Ireland – Irish Railways
12.06.16
READ
Geo-environmental site investigation of a large former quarry – Kent
12.06.16
READ
Operation of Three Multiphase Extraction units – Italy – Chemical Company
12.06.16
READ
Great Baddow Ex Situ-Bioremediation – 3R
12.06.16
READ
Kings Cross Gasworks Remediation – Bam Nuttall
12.06.16
READ
Posts navigation
Older posts
Accreditamenti
Sitemap
Facebook
YouTube
Twitter
LinkedIn
© Copyright Ecologia