Ecologia has been recently awarded a contract for construction, installation and commissioning of a Multi Phase Extraction (MPE) system for the remediation of a service station in central Italy. The Multiphase Extraction system will operate seven extraction wells. The air and liquid will be separated in a knock-out tank and the client has opted for a system configuration with Granular Activated Carbon (GAC) air filtration upstream of the vacuum blower for the treatment of the soil gases. An oil-water separator and dual GAC filtration will be used to treat the extracted liquids. The system will be telemetrically controlled by a PLC. The plant is scheduled to be delivered to site and commissioned in January 2019.