Ecologia has recently completed a large geo-environmental site investigation in support of a masterplan expansion which includes mixed residential commercial use and a significant infrastructure upgrade comprising of the construction of a major relief road.
The works consisted in drilling a number of cable percussion boreholes to a depth >30 m below ground level and trial pitting to produce baseline information (to include geotechnical, environmental, agricultural land classification and minerals assessment) to enable Ecologia to produce the relevant documentation to support the application.
Despite the adverse weather conditions encountered in January/February Ecologia has managed to complete the proposed scope of work within the very tight timescale set by the client.