Ecologia undertook a design and build remediation of a former petrol filling station and garage/workshop affected by petroleum contamination.

Works included application of ozone into the groundwater via a sparge system and the excavation and ex-situ bioremediation of the old soakaway to deal with the oils in that part of the site Ecologia also achieved timely sign off of the associated planning conditions.