Ecologia is assisting Dunton Environmental in the next phase of geotechnical monitoring works at Kilnwood Vale, near Horsham, West Sussex. The scope of works includes the installations of vibrating wire piezometers (VWPs), Datum Points and Ground Gas Monitoring boreholes. The installation of the first batch of VWPs was completed this month with ongoing monitoring until February 2018. The further VWPs will be installed in September 2017 and monitored until May 2018. The VWPs will be monitored using a remote gateway system enabling us to access the data from the office and provide fast updates to the client regarding the stability of the surcharge test.