Ecologia was appointed by a large construction company, to prepare numerical risk assessments, remediation strategy, groundwater remediation and verification associated with the redevelopment of a railway station.

A key challenge was integrating several contractor interfaces to deliver a remedial strategy that delivered for all phases of development within the constraints of a very confined and busy site. Ecologia’s expertise on discrete bespoke in-situ systems was of specific value in order to design and operate a remediation whilst minimising potential disruption to the site works and the future users.