Supply and Operation of Multiphase System – Ireland – Irish Railways

Ecologia installed and commissioned a purpose designed and built multi phase extraction system inside railway arches beneath Connolly station in Dublin. The remediation system was manufactured to be fully automated and telemetrically controlled allowing vital checks to be carried out remotely.
The project presented demanding logistical constraints with equipment requiring assembly inside the arches. We were able to undertake drilling works, pipework insulation and surface preparation groundwork within the arches to a high standard whilst forced ventilation and rigorous health monitoring ensured a safe working environment.