Ecologia has successfully completed the second phase of soil remediation works at a confidential / undisclosed chemical facility in the UK, impacted predominantly with Benzene and Mercury.

The recent works included the bulk excavation of materials within a source area to a depth of 2.5m bgl. Following which backfill operations included the installation of a clay cap, and re-use of materials (approximately 20% of site won materials where reused under a MMP) to reduce the overall cost to the client

Previously Ecologia had conducted remediation works complementary to the systems and measures already being implemented by the client’s site team. Which most recently had included a 9 month in-situ remediation programme to remediate the groundwater and deeper vadose zone in 2016.